Engineer - Reliability Engineering
MOVUS
India · Infinite Loop, Cupertino, CA, USA
Posted on Jan 9, 2026
🔍 Key Responsibilities
📡 CBM Data Analysis & Execution
- Perform routine vibration Analysis on rotating equipment (motors, pumps, compressors, gearboxes, fans).
- Ensure correct sensor placement, route adherence, and data quality using tools like all Sporadic Data Collectors.
- Follow standard operating procedures aligned with ISO 20816/API 610/617.
📊 PlantOS & DRS Platform Integration
- Upload and map collected data to PlantOS, ensuring correct asset tagging and metadata accuracy.
- Validate data visualization, alarm thresholds, and health indicators in PlantOS dashboards.
- Support the DRS value chain by linking CBM findings to RCA, RCFA, and maintenance actions.
🧠 Diagnostic Support
- Conduct preliminary vibration analysis (FFT, time waveform, envelope) to flag anomalies.
- Escalate abnormal findings to CBM Lead or Reliability Engineer for deeper diagnostics.
- Maintain trend logs and alarm history for critical assets.
🤝 Site Coordination & Reporting
- Coordinate with operations and maintenance teams for equipment access and safe data collection.
- Maintain daily logs, route completion reports, and exception summaries.
- Participate in weekly CBM review meetings and contribute to RCA discussions with vibration insights.
🧠 Required Skills & Competencies
Skill Area
Description
Vibration Analysis
Basic to intermediate FFT, envelope, and time waveform interpretation, Level-2 certification in vibration Analysis. Certification in Oil, Thermography, NDT will be a Plus.
CBM Tools
Sporadic analysers available in the market.
PlantOS Familiarity
Data upload, asset mapping, alarm validation
Standards Compliance
ISO 10816, API 610/617, ISO CAT-II certified
Digital Literacy
CMMS (SAP PM), mobile data collectors, PlantOS interface
Communication
Clear reporting, escalation of anomalies, team coordination
📈 Performance Metrics
- ✅ % of planned CBM routes completed on time
- 📊 % of data successfully visualized in PlantOS
- 🚨 Number of early warnings detected and escalated
- 🔁 RCA/RCFA support participation and traceability
- 📈 Improvement in MTBF/MTTR for monitored assets